Saturday, August 24, 2019

Rear Battery pack continued progress

The rear pack has been stuffed.

Kilovac LEV200H4ANA Solenoid The main POS must be turned on before the main cable leaving the pack is live.
The terminals were also covered with insulation.
Installing the bus bars and BMS wiring.


Installing the bus bars and BMS wiring.

Installing the bus bars and BMS wiring.

BMS wire management.

Wires left to right: Main solenoid control and confirmation, Main POS out, Main connection from 20 modules to 6 modules, heater connector, 12 pin BMS connector, heater connector.

20 module ready for install.

6 module connected and shield in place.

20 module beginning decent.

20 module 2 module deep.

20 module 95% deep.  Now the supports are unscrewed to finish lowering into place.

Next task, drill the stud holes through the lid and caulk the grooves to seal the box.
There will also be a breather hole in the lid center with desiccant.
Next step, put it up in the car.