Kilovac LEV200H4ANA Solenoid The main POS must be turned on before the main cable leaving the pack is live. The terminals were also covered with insulation. |
![]() | |
|
![]() | |
|
![]() | |
|
![]() | |
|
![]() |
Wires left to right: Main solenoid control and confirmation, Main POS out, Main connection from 20 modules to 6 modules, heater connector, 12 pin BMS connector, heater connector. |
![]() |
20 module ready for install. |
![]() |
6 module connected and shield in place. |
![]() |
20 module beginning decent. |
![]() |
20 module 2 module deep. |
![]() |
20 module 95% deep. Now the supports are unscrewed to finish lowering into place. |
![]() |
Next task, drill the stud holes through the lid and caulk the grooves to seal the box. There will also be a breather hole in the lid center with desiccant. Next step, put it up in the car. |